The following is a suggested method of handling columns and mid-hinged columns from vehicle to site.
Installation details and site considerations are to be taken into account, and normal risk assessments are to be carried out for the full installation process. Although columns can be lifted and carried to site, the suggested method of handling would be to lay the base section of the column in the trolley, securely strapping into position. This can be achieved with a ratchet type strap to enable secure transportation to the location of the foundation hole. The column can then be lowered into the ground by either un-strapping from the trolley and lifting the column and gently lowering into position, or by lowering into position with the trolley still attached. The trolley can then be un-strapped whilst the column is already in the ground.

 

 

trolley3 trolley1 trolley_4